KitLog pro

Powered By Kitlog Pro v2.0

Adams RV-7A Build
' style=
Date:  8-25-2023
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Brakes, Panel, Wheel Fairings

Finish most of the brake line fabrications, exception being the internal line from parking brake to bulkhead fitting. Also finializing instrument panel for Stein. Sanded wheel pants so two halves fit and establish level lines
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.