Powered By Kitlog Pro v2.0
Adams RV-7A Build
RV-7A
All
8-25-2023
< Previous Log Entry
Next Log Entry >
Date:
8-25-2023
Number of Hours:
7.50
Manual Reference:
Brief Description:
Brakes, Panel, Wheel Fairings
Finish most of the brake line fabrications, exception being the internal line from parking brake to bulkhead fitting. Also finializing instrument panel for Stein. Sanded wheel pants so two halves fit and establish level lines
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
131
879
Avionics
11
74
Empennage
16
109
Engine
1
7
Fuselage
50
335
Landing Gear
17
109
Miscellaneous
5
29
Systems
5
32
Wings
26
184
Copyright © 2001-2024 Matronics. All Rights Reserved.