Powered By Kitlog Pro v2.0
Adams RV-7A Build
RV-7A
All
8-16-2023
< Previous Log Entry
Next Log Entry >
Date:
8-16-2023
Number of Hours:
7.50
Manual Reference:
Brief Description:
Landing gear and panel design
Some pinhole filling and then worked on the panel layout and contacting Stein regarding switches. Then started gear leg fairings. Drilled and fit hinge to one side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
131
879
Avionics
11
74
Empennage
16
109
Engine
1
7
Fuselage
50
335
Landing Gear
17
109
Miscellaneous
5
29
Systems
5
32
Wings
26
184
Copyright © 2001-2024 Matronics. All Rights Reserved.