After a year we clecoed the top skin back on. Installed the 4 support L angles to the top skin. Discovered that the top skin conflicts with the panels ability to be lowered. So, I bought some weather stripping material that should raise the top panel enough so the instrument panel can be lowered. We connected the panel vents to the NACA openings.