KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  2-3-2019
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Drilled out stab rivets

I drilled out about 60 or so rivets on the right stab for the patch. The stab patch calls for adding four rivets to each rib for a total of 9 rib rivets. I drilled the holes and then riveted the ribs with A4 rivets. I clecoed the leading edge doubler patch to the stab. Before riveting the doubler I will remove and debur the holes I drilled at one end. I am also debating drilling about a 3/4" hole in the leading edge between each rib to allow a magnet to be inserted. The flexible magnet will get the mandrels that were drilled and fell into the cavity. I can also fashion a 3/8" plastic tube to act as a vacume to get the rest of the debris. The doubler will cover the holes once complete.
' style=

Stab patch doubler

Stab patch doubler

' style=

Doubler clecoed

Doubler clecoed

' style=

Riveting to go

Riveting to go

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.