Brief Description: Installed aileron stops and tunnel tops
One hundred degrees in the hangar again today. Nothing like Texas in July heat. We fit and installed the aileron stops. Forgot to get a picture of them but will do so tomorrow. We opted for about 14 degrees of limit. Dean screwed the aft tunnel top in place. The top has about 30 screws which is hard to believe. We will do the front tunnel tomorrow. I installed three cotter pins in control castle nuts. All control castle nuts now have cotter pins. I also torqued some bell crank nuts and tightened some stop nuts. I applied blue torque seal to the nuts.