KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  3-3-2018
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Fuel fittings, wiring

Today Tim, Dean and I ran a few more wires. We finished connecting wires to the diode. We finished the wiring for the Ray Allen flap sensor. We spliced the flap sensor, and Kavelico fuel and oil pressure 5v power wires together. We positioned the fuel feed and return AN bulkhead fittings on the firewall and drilled the holes. I cut 1/2" fuel hose to connect the fuel manifold to the push on AN fitting.
' style=

Diode wiring

Diode wiring

' style=

Fuel feed and return lines

Fuel feed and return lines

' style=

Checking return line

Checking return line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.