KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  1-20-2018
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Relays and engine mount

Today it was finally warm so was able to get to the hangar and do some work. Dean beat me there and had already finished wiring the fuel pump, aux fuel pump and flap relays. He also was able to remove the sides of the crate and expose the engine. Very humbling as I was totally baffled by this yesterday and was ready to cut the sides off. Thanks Dean! With the engine exposed I was able to install the engine mount and torque the donuts properly. The engine is now ready to install on the Cruzer as soon as I can round up a couple of burly weight lifters. I also bent and drilled the fine filter support bands for mounting to the engine mount.
' style=

Crate disassembled

Crate disassembled

' style=

45mm between donuts

45mm between donuts

' style=

Engine mount on the engine

Engine mount on the engine

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.