KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  8-18-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Installed map box

Installed the 1" ipad ball to the door of the map box. Then installed the map box to the instrument panel. Still have to install the switches but may wait until the switches are wired.
' style=

Map box installed

Map box installed

' style=

Passenger warning

Passenger warning

' style=

Panel

Panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.