KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  7-19-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Separating, labeling, wires

Dean came over and started to separate wires and route the appropriate wires to the right or left side. He identified cables with their bundles and their routing. Added a couple more wires to the ExBus such as the 22ga Master switch wire and Avionics wire. Put shrink wrap on wires that needed it. I riveted the flaperon covers and floor until I ran out of A4 rivets. Finished riveting the fuselage side of the flooring and flaperon covers with A4 and A5 rivets.
' style=

More wiring

More wiring

' style=

Riveted flaperon covers

Riveted flaperon covers

' style=

No more clecoes on outside

No more clecoes on outside

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.