KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  7-11-2017
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Installed grounding block

Worked on servo cable and installed female D9s. Ran the wires under the seat and out through the console. Positioned and drilled the hole through the firewall for the gounding bolt and forest of grounding tabs.
' style=

Servo cable

Servo cable

' style=

Firewall side grounding tabs

Firewall side grounding tabs

' style=

Cabin side grounding tabs

Cabin side grounding tabs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.