KitLog pro

Powered By Kitlog Pro v2.0

Doug's Web Site
' style=
Date:  7-2-2017
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Nut plates and more

The last couple of days have been all about nut plates. Drilling the holes, dimpling and squeezing the small rivets. Not hard but tedious. Anyway, finished the arm rest sides and trial fit the tops. On the tunnel had to put the sides inside the flange on the floor to get the holes to line up. On the baggage floor, I had to cut off the end of the center L angle support. It was conflicting with a nut plate on the tunnel top. The tunnel top and arm rest top are powder coated grey but I might cover with a black carbon fiber. Don't particularly like the black and grey contrast. Reinstalled the pilot side floor and tightened the worm clamps on the fuel lines.
' style=

Nut plates installed

Nut plates installed

' style=

Rear tunnel

Rear tunnel

' style=

Both lids on

Both lids on

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.