KitLog pro

Powered By Kitlog Pro v2.0

DOUG'S WEB SITE
' style=
Date:  5-18-2004
Number of Hours:  2.00
Manual Reference:  Sec 6-4
Brief Description:  Drilling the Vertical Stabilizer

Fluted and straightened the VS-704, VS-705, VS-706 and VS-707 ribs. Final drilled #30 the VS-808PP, VS-410PP, VS-411PP and VS-412PP to VS-803PP pieces. Also final drilled #30 the rib to spar attach points.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.