Cut three layers of fiberfrax to fill area previosly occupied by dog pan cutout. Secured in place with red rtv silicone.
Installed SS firewall. Also installed heater control, gascolator, oil filter bracket, and thru firewall 6D tee (will cap one end). Installed brackets for rt side rudder pedal springs. Installed grommets for all control cables; throttle, prop, mixture, heat and alt air.
Removed old nose strut gas spring replaced with new GM-028 part.