Added oil filter. Added hole for 3/8" elbow for return line from boost pump. Relocated heater inlet to rt side - necessitated by oil filter placement. Will plg old hole with saved piece plywood and glass with flox and 2 bid.
Removed everything to get ready to transver and drill all holes in stainless.
Note. prop govenor is spring loaded to high rpm low pitch - pulling out the prop control moves gov to low RPM.