KitLog pro

Powered By Kitlog Pro v2.0

DARRYL'S WEB SITE
' style=
Date:  3-23-2009
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Main Gear Priming, wheels apart

Cut out calipher grooves, sanded cleaned and primed. Pulled apart grove wheel assembly's to grease bearings and reassemble.
' style=

Gear with calipher cut-outs primed.

Gear with calipher cut-outs primed.

' style=

Wheels disassembled to re-pack wheel bearings.

Wheels disassembled to re-pack wheel bearings.

' style=

Wheels disassembled to re-pack wheel bearings.

Wheels disassembled to re-pack wheel bearings.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.