|
|
Derricks SeaRey Build
|
Date: 7-7-2016
|
Number of Hours: 5.00
|
Manual Reference:
|
Brief Description: Wiring, Brakes, MLG
|
|
More cleaning-up of the wiring,, Terminating ends, assembling connectors, and supporting the wire-runs
Hoisted the airframe off the ground so I could run the actuators through, once again, to verify that the up & down MLG icro-switches were correctly placed. Good thing I checked, had to reposition two of them!
Bled the brakes (Probably will require another bleeding),, mainly did this to check for leaks.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |