KitLog pro

Powered By Kitlog Pro v2.0

Derricks SeaRey Build
' style=
Date:  8-5-2016
Number of Hours:  1.00
Manual Reference:  
Brief Description:  MLG Check-Out

Jacked the airframe to conduct a full, operational check of the MLG using the actual cockpit controls.
Up until this point, all of my MLG actuator checks were accomplished by applying 12VDC, directly to the actuators,, mainly to check for freedom of movement and micro-switch placement.

Today, was a full-sytem check, including the position lights.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.