KitLog pro

Powered By Kitlog Pro v2.0

Don Jones RV9A
' style=
Date:  6-12-2008
Number of Hours:  6.20
Manual Reference:  
Brief Description:  Began Right Elevator Construction

I began construction of the elevators. My grandson was over and was dying to help me work on the plane, so I put him to work clecoing the spar and ribs together for match drilling. I decided to do both elevator's at the same time. I am preparing the parts for each one and then will be assembling both of them back to back.
' style=

Grandson at work on the Right Elevator

Grandson at work on the Right Elevator

' style=

Right Elevator parts ready for primer

Right Elevator parts ready for primer

' style=

Fitting the stiffeners to the skin

Fitting the stiffeners to the skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.