KitLog pro

Powered By Kitlog Pro v2.0

Dave White RV-7 Build Site
' style=
Date:  11-23-2014
Number of Hours:  2.50
Manual Reference:  
Brief Description:  LH and RH spar inspection nutplates

Each wing undersurface has 3 inspection panels held on to the spar by #6 nutplates. These nutplates are prepared and attached in a similar manner to thaose for the fuel tabk attachments recently done, and today was spent drilling, countersinking and riveting the required nutplates. Each panel has 4 screws arttaching it to the spar (and another 8 x #8 screws attaching it to the ribs. So preparing each spar required 36 holes to be drilled out (3 per nutplate) - that is 72 in total for both wings.

Also done in this period was the dimpling of the inspection panels themselves.
' style=

Ready to rivet #6 Nutplates for inspection panels

Ready to rivet #6 Nutplates for inspection panels

' style=

How panel attaches to spar.

How panel attaches to spar.

' style=

Riveted and Alodine'd

Riveted and Alodine'd

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.