Because there are no step by step directions I was having to spend quite a bit of time figuring out the "critical path"
The Collective assembly is shipped without the nuts being saftied or cotter pinned. I originally thought this was an oversight. Actually the assembly needs to be removed from the ship in order to make the interior panels surrounding the pilots collective and the matching one on the other side.
It appears to me that all of the interior panels need to be made now. I had originally thought they could wait until the end.
The collective come out the side, after all the sheet metal is removed.