Now that the pod is mounted it is time to start hooking up wires. I got all of the main boxes mounted along with the switches and the only circuit breaker in the ship. I will have Master and EFIS power switch. On the bottom row is a backup power switch that will supply the voltage regulator. The EFIS also has a backup battery. Now if the VP-X circuit breaker box croaks, I will have backup.
I had to rearrange the RDAC/IOX panel because the originall setup would not clear the control rod that runs accross the back wall.