Christmas came early. Photo one shows the new rotor head all packed nicely in it box. It is much heavier than the old one in the area of the bearings. It is also much easier to manufacture on the new jig constructed by Murray.
Photo 2 is the lead/lag adjustment tool. This clamps on the rotor head and holds the laser level, also shown. The other piece bolts to the head to allow my gantry crane to lift it up into place.
Last Picture are the new adjustable lead/lag plates. This should make the adjustments a piece of cake. NOTE: These do not come with the new rotor head, which supprised me. They can be retrofitted to the old style head however.