KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
' style=
Date:  3-24-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Remove and Refinish Instrument Pod and Floor

Well I finally quit procrasinating. I have the new bubble but I did a lot of damage with the paint stripper that needs to be fixed. Also MGL Avionics sent me the proper OAT probe. NOTE a Westach OAT probe will not work with their Air Data Computer.

Naturally it is mounted under the floor. To get there
1. Remove the bubble
2. Remove the Instrument Pod
3. Remove the Instrument Pod Support
4. Remove the floor

It actually takes much longer to do it than it take to write this. All the instrument wiring had to be taken loose and fed through holes etc. PITA. Photo 1 is the end result

I cleaned up the Pod, support and floor and reshot with bed liner. This time I did the inside of the instrument pod. No one will ever see it but it looks much better see Photo 2. I will let it dry overnight, install the OAT probe then reinstall everything.

Including the bubble - wish me luck. You can see the new one in the background of Photo 2
' style=

Cabin back Apart

Cabin back Apart

' style=

Instrument Pod and Bubble

Instrument Pod and Bubble

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.