KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
' style=
Date:  10-12-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Finish Tail Boom Wiring Read Avionics Manual

Nothing really to take a picture of. My order from Spruce showed up so I was able to finish the tail boom wiring. I was a little concerned about the available ground between the TR Gearbox and the frame. A good ground is needed for the chip detector. So what I did was T off the ground for the Aft Nav Light and run it up to a bolt on the tail rotor. Now I know I have a good ground.

I started trying to decipher the MGL manual to program my avionics. I am pretty sure it is written in English but I could not understand what it was talking about. I sent my pinouts for the IOX, RDAC and VP-X to their California office. Matt called me back and said no problem. He is going to program the whole thing including creating screens for all my gizmos. Great Service.

FYI the bare clamp to hold my Mixture cable securely is a 1/4" from Spruce. It is however too big for the other two cables. I guess I will have to order some of the 3/16" size. Or put a couple of layers of heat shrink on the housing.

I have to keep telling myself "The goal is to get it flying not perfect"
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.