KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
' style=
Date:  12-18-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Disassemble and prep for paint

Steve Dunne came by and helped me disassemble the ship. All of the sheet metal needs to come off in order to prime and paint the interior surface. Because none of this is visable in the completed ship I have decided to paint in the garage. There is a lot of dust and I don't expect the paint to turn out very well.
' style=

Full Frontal Nudity

Full Frontal Nudity

' style=

Side Nudity

Side Nudity

' style=

Getting Ready to Prime

Getting Ready to Prime

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.