KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  2-13-2017
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Tapes and Patches

Two days log. Continued putting on all the drains, inspection covers, brake line exits, patches and tapes. Put all the patches on the bottom. Everything is on finally.

Need to mark the centerline of some very long tapes to put on the center of tubes like on the sides. Normally you fold the tape in half and create a small crease on the centerline. Takes a lot of time. Made a fixture that draws a pencil line along a tape as you pull it thru. Does a complete fueselage long tape in about 2 minutes. Put on the first two edge tapes and the center tapes on the bottom of the fueselage.

Running out of the linen color glue, will use the other stuff on the back of the fueselage where the inside cannot be seen.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.