Put the bottom fabric on the right elevator and one side of the rudder. Later prepared both for top or other fabric. Ironed the right elevator up to 350 degrees.
Did the rib stitching on the one elevator that is ready. The blocks placed under the stitch did well in holding the fabric out so it is straight from the LE to TE of the elevator rather than pulled in.
Cut out some of the patches for the remaining surfaces. Cut out the lexan for the rudder.