The backordered parts arrived including the firewall and four bushings that kept me from putting it on gear. Will get back to that after the tail are covered.
Put one side on the left elevator. Out of space in the shop, so the top of the fues is storage for drying parts. Decided to add corner patches to the stabs where ther are almost 90 degree corners after looking at the neighbor's Rans S6. Put on corner patches and started doing the perimiter tape.
Did rib stitching rivets and tape on theother stab.