KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  11-4-2016
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Header Tank

Got out the header tank and drilled holes. Put in fittings and filled with water for test.

Cut out and put in angles in the fues. They do not fit too well due to the shape of the bottom of the tank. The front one needs to be about a 3" high and a block of wood to fit the bottom and raise it. Will go over to the EAA hanger and fab up an angle from some scrap .063 when it stops rainining.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.