KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-2-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Tail fairing and reorganize hanger

Continued on tail fairing. Installed all nutplates. Drilled bottom gap filler for tap of longerons, drilled out and dimpled lower gap filler.

Reorganized the hanger. Moved some things around until I could get both aircraft in facing forward. Pulled out the -6A and the -10, move some other things around and then moved the -6 back in. Had to fuss around to get enough room. Moved the -10 in with enough room to move in front and behind it. Didn't hit anything, thanks Jim!

The -10 sure looks big compared to the -6A. Poor thing is being ignored. Did check the stab against the new SB for cracks in the shear web, was Ok so it is good til the next annual.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.