Brief Description: Hinge right door, start on latches
Hinged right door.
Cleaned up the hanger. Need a day with some wind to open the RV and main door and blow it out with a leaf blower. The RV-6A is covered with sanding dust, at least the glider trailer is white and you can't see it.
Started on the door latches. Between the Plane Around and Vans instructions, I figure it will take about 6 hours to do this door and 2 for the next. Installing the Vans guide blocks initially and then will replace them with the better ones. Got the guide blocks mounted and the Plane Around gearbox.