KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  12-21-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Left wing bottom skin

Cut aileron push rods to length and primed inside. Put inside hanger bathroom and turned heat up to 75 to cure. With outside temps around 40, the hanger, even with insulation in the walls and ceiling to current house standards, takes a lot to heat. I set it up to 55 when starting work and turn on the overhead fans.

Finished riveting the right bottom skins. One minor dimple.

Next are 64 nutplates on the two wings. Will be a fun day.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.