KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  9-24-2013
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Skybolt brackets

Drilled the holes for the first two Skybolt brackets up the sides. Installed rivets, Pushed motor mount back iinto place and tightened the bolts except one that needs someone in the cabin to hold it. Will do later, still need to put the cotter pins in.

Drilled the remaining brackets and their shims. Prepared for riveting and riveted. Am out of -5 rivets, so have been using the rivet cutter to make the right length rivets. Sort of slows things down. Completed all the rivets. Now to add the plates on the bottom for the nutplates instead of hinge for the bottom cowl.

Gor my tracking number from Vans for my motor. It is to be delivered this Thursday!!! I am almost completely out of work on the firewall after tomorrow. Will hang the motor when it gets here.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.