KitLog pro

Powered By Kitlog Pro v2.0

Bruces Web Site
' style=
Date:  11-19-2012
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Canopy cover backup strips

Drilled the three canopy cover backup strips. Decided to set them in flox to level out their bearing surfaces. Also will hold them in place until the canopy cover is finally bolted in. This won't be for a long time.

Installed some additional insulation in the fues while the top is off.

Received most of the parts to do the -6A annual. May start soon.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.