Assembled ribs. Riveted, 58 rivets each side for the landing gear attach point. Riveted.
Attached ribs to firewall and riveted except for the last 8 rivets. Plans called for 470-4-5 for the bottom rivets. Just a shade to short, so I made up some 5.5's from leftovers from the -6A.