|
|
Harteveld, Chinook Plus 2
|
Date: 5-11-2017
|
Number of Hours: 2.00
|
Manual Reference: n/a
|
Brief Description: Seam Taping Elevator
|
|
Last weekend was crazed, with way too much kids soccer, plus an epic aikido seminar for me, to get out to the shop. Was able to sneak out of work a bit early today, however, which bought me two hours. Clutch time, too, since I basically had one outstanding glue task to do on the elevator - application of the seam tapes on the edges, before final shrink. Next weekend will be a wash as well, due to a hiking excursion to New Hampshire, but next time I get out to the shop I should be able to shrink those tapes and have the elevator complete. Woo-Hoo!
|
|
Trying to keep it neat
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |