Installed the three bulkheads to fuselage with clecos. Checked all three with the center line of fuselage. Added the fairlead materia lto center bulkhead and the "L" angles to the rear of the baggage bulkhead. Layed out and drilled pilot holes for rivet lines in all three bulkheads.