KitLog pro

Powered By Kitlog Pro v2.0

DAVE'S WEB SITE
' style=
Date:  9-9-2006
Number of Hours:  3.40
Manual Reference:  
Brief Description:  Turtle Back Install

Turtle Deck prep work continues:

-Finished installing all the fuel lines on the tank

-Wired both fuel pumps. I ended up using the heater wires for pump #2.

-Built coax cable for the transponder antenna. Installed 2 X BNC connectors. They weren't nearly as hard as I anticipated, should be able to crank out the Glasair's without any problem.

-Adjusted drain in the bottom of the tank so it doesn't rub on the bottom of the fuse.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.