KitLog pro

Powered By Kitlog Pro v2.0

DAVE'S WEB SITE
' style=
Date:  4-22-2006
Number of Hours:  6.30
Manual Reference:  
Brief Description:  Gear, Instrument Panel, Etc

Wired Gear aft of main bulkhead

Plumbed hydraulics for gear

Plumbed brakes

Installed a few Dzus fasteners for instrument panel. I'll need to buy the next size up for the fateners themselves...they are about 1/16" too short.

Dry fit tank. I need to figure out what all the connections are for...there seems to be one extra. Additionally, the tank came with a gascolator, so I can send back the one from A/C Spruce.

Minimized drag on the aileron vertical torque tube and installed aileron cables to the vert torque tube. Entire system is now very smooth. That coupled with the spades should make for some very nice light ailerons.

Installed seats for a few minutes just to get the feel of the setup. They seem very comfotable, but I worry about the durability in a water environment.

Decided I'm going to have to cut the top of the sticks off, otherwise they will be too large. I'm not sure what to do with the brake handle quite yet...I'll have to figure that out tomorrow.

Installed the boot rings on the main gear. Glued the boot to the ring for the elevator pushrod.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.