Built/attached tie rods to tailwheel extension. Manual said to use 4 " tie rods....I had to cut 3/4" off to make them work.
Installed tailwheel extension/retraction cables. Installed retraction spring. Cut multiple holes in transom for tailwheel extension/retraction, rudder cables, etc.
Installed downlock cables.
Hooked up aft end of elevator pushrod.
Finished AN-6 bolts on port side gear spindle bracket.
Installed rudder cables. Manual said to route them under the cockpit outboard lower tubes...that would twist them a bit much so I routed them over the top to minimize friction...hope it works!
Began installing wiring harness...rt side of fuse.
Looking aft at main bulkhead. Notice downlock removal cables in place/elevator pushord/rudder cables.