KitLog pro

Powered By Kitlog Pro v2.0

Russ and Marnies RV-9A
' style=
Date:  1-20-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Panel and Wiring

Painted the panel and started placement of the avionics. Electrical wiring involves building mounts for the multiple control units and wiring hubs. The trick is to build the shelves so they can be finally assembled from the bottom after the skin is riveted. Also, to place all the components so they can be connected and serviced from below.
' style=

Panel with paint

Panel with paint

' style=

Vertical Power c/u and G3i c/u

Vertical Power c/u and G3i c/u

' style=

Top view of the panel/sub-panel

Top view of the panel/sub-panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.