Started on the canopy cabin frame today. Laid out the dimensions on the bench top and then clamped and drilled and clecoed the rear half of the frame together. Between 8/10 and now, I bent (a few times) and finalized the brake lines. I chose to run them in a different path than what the plans indicate. I match drilled the main spar bulkhead covers and did the initial work on the fuel valve and center floor cover. These will have to be modified for the Andair pump/filter/valve I have coming from England.