KitLog pro

Powered By Kitlog Pro v2.0

Debo Cox - Zodiac 601 XL
' style=
Date:  11-12-2008
Number of Hours:  1.00
Manual Reference:  6B
Brief Description:  Front Torque Tube Bearing

After work today I took an hour and leveled the torque tube so that the front bearing could be located on the center spar. I removed the center spar section and located 4 holes to secure the bearing into place. They'll be drilled out for 3/16" bolts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.