KitLog pro

Powered By Kitlog Pro v2.0

Debo Cox - Zodiac 601 XL
' style=
Date:  5-4-2006
Number of Hours:  5.00
Manual Reference:  6T
Brief Description:  Elevator Trial Asembly and Corrosion Protection

Assembly of the elevator has gone very well. I've had to work a lot, so progress has been made in short bursts, but I find that this helps eliminate mistakes too. There is a real temptation to keep going after a long building session, and that's when mistakes are made. I think the elevator has some of the finest examples of workmanship yet - like I'm finally starting to figure out exactly what I'm doing. I tool a lot of time getting my leveling frame correct on the table so that there won't be any measureable twist.
' style=

Drilling elevator ribs

Drilling elevator ribs

' style=

Close-up of trial assembly

Close-up of trial assembly

' style=

Parts dis assembled, protection applied and drying on the rack

Parts dis assembled, protection applied and drying on the rack

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.