KitLog pro

Powered By Kitlog Pro v2.0

Don's RV-8 Build Site
' style=
Date:  7-26-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Vert stab work

Ran the wiring conduit along front spar and secured with cable ties. Fed end runs of conduit through 11/32" holes in ribs. This locked the conduit in place with the corregations and trimmed ends. Very happy with this installation.
' style=

Wiring conduit

Wiring conduit

' style=

Top rib

Top rib

' style=

Bottom rib

Bottom rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.