Powered By Kitlog Pro v2.0
Don's RV-8 Build Site
RV-8
Empennage
7-14-2020
< Previous Log Entry
Next Log Entry >
Date:
7-14-2020
Number of Hours:
3.00
Manual Reference:
Brief Description:
Vert stab work continues
Drilled the hole in the LE rib for the wire conduit. Surface prepped the VS-801PP skin and wiped the skin and all parts down with alcohol to remove the scuffing residue. Next step dimpling all parts and skin.
Hole in LE rib for wire conduit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
82
298
Empennage
75
226
Shop
5
67
Tools
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.