Powered By Kitlog Pro v2.0
Don's RV-8 Build Site
RV-8
All
6-22-2020
< Previous Log Entry
Next Log Entry >
Date:
6-22-2020
Number of Hours:
3.00
Manual Reference:
Brief Description:
Vert Stab work continues
Peeled of the inside vinyl from vert stab skin and clecoed the skin onto the frame. Matched drilled skin to spars and ribs using a #40 reamer.
Vertical stabilizer
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
82
298
Empennage
75
226
Shop
5
67
Tools
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.