KitLog pro

Powered By Kitlog Pro v2.0

Don's RV-8 Build Site
' style=
Date:  6-21-2020
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Started work on vertical stab

Began work on the vertical stabilizer. Clecoed rear spar doubler to rear spar and added rudder hinge blocks. Edge prepped, straightened flanges and fluted all ribs and clecoed them in place. Match drilled all rear spar hardware and all rib connections to #30 hole using reamer.
' style=

Vertical stabilizer parts

Vertical stabilizer parts

' style=

All clecoed up

All clecoed up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.