KitLog pro

Powered By Kitlog Pro v2.0

Don's RV-8 Build Site
' style=
Date:  6-16-2020
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Clecoed rear spar to HS in prep to rivet

Prepped the scratches I created while riveting foward spar to skins. Mixed up a small batch of P60G2 and used an airbrush to prime the scratches on the forward spar. Actually worked pretty good and I'm happy with the results. Clecoed the rear spar into place and decided I need to make a stand or something to hold the rear spar vertically to finished riveting.
' style=

Prepped and airbrush primer on scratches

Prepped and airbrush primer on scratches

' style=

Ready to rivet rear spar to stab

Ready to rivet rear spar to stab

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.